Targeted Translucent in 2019, Here's the Current Progress of Trans Papua


- Trans Papua Road with a total length of 4. 330 km will certainly be connected entirely in 2019. The road route that was still a lot of jungle is entirely connected with the condition of asphalt road and also non asphalt or in the form of pavement.

Currently the length of Trans Papua road that has penetrated reaches 3. 976 km. The progress is a combination of 2. 905.75 km of roads in Papua Province and 1. 070.62 km of Trans Papua road in West Papua Province.

Tr
Based on data from Directorate General of Highways Ministry of PUPR received on Wednesday (28/2/2018), from total 3. 259.45 km long Trans Papua in Papua Province, whose condition has been asphalt long 581.04 km. While the condition of land or non asphalt 1. 324,72 km, and still forest still have 353,7 km or 10,85% more.


Source : https://finance.detik.com/infrastruktur/d-3889785/ditarget-tembus-di-2019-begini-progres-trans-papua-saat-ini
LABEL : [trans papua, trans way papua]

Share this

Related Posts

Previous
Next Post »